Our Projects

PROJECTS

Let Rachel bring our Core Values to your
next Project. Integrity. Experience.
Creativity. Safety.

MN Zoo Waterfront Renewal

Rachel was contracted by PCL Construction to demolish and reconstruct the existing plaza and the snow monkey exhibit at the MN Zoo. The first major challenge was to construct the causeway from the existing trail, through the lake and tie it to the existing plaza. The area inside of the causeway was dewatered, muck was removed and sand was imported to fill in the old lake bed to above the water level of the lake. Once this was done the demolition crew was able to access the site and complete the demolition of the site and structures. New stormwater utilities were installed to extend the existing discharge pipes at the building line out to the new edge of the lake. Some of the stormwater is now being diverted into a pretreatment structure as well.  Rachel was able to construct this project within schedule.

Project Highlights

200,000 CY of Common Excavation – OR –
Furnish and install 1,100 LF drain tile

10′ Diameter Lift Station with 72″ DuroMaxx Pipe Wet Well

DoLI Inspected Project with 900 LF of pipe

10,000 cy of fill in an existing lake

Built a causeway of rock to access site across an existing lake

Crushed all clean concrete on site and used as fill for the plaza construction

Excavate and backfill for a 13′ wide habitat wall footing

Other Projects