Our Projects

PROJECTS

Let Rachel bring our Core Values to your
next Project. Integrity. Experience.
Creativity. Safety.

Rum River Channel Ex2

Anoka, MN

The Rum River Channel Excavation II project was completed to provide boat access from the Mississippi up the Rum River to the Anoka downtown docks. With unusually high water tables and very little room for error the timing of this project was crucial. Once the elevations hit an acceptable depth the crew dove in and tackled the work. The 340 excavator was able to direct load into offroad tracked trucks and while the water was up to the glass on the cab the crew expertly avoided any damage to the machines. The talented project team was able to successfully navigate excavating around high voltage power lines and sewer running through the work area.

Other Projects