Our Projects

PROJECTS

Let Rachel bring our Core Values to your
next Project. Integrity. Experience.
Creativity. Safety.

DGC UREA Site Utility Completion

Completion Date : Anticipated May 2017

Rachel was awarded the contract to complete the remaining site utilities for the UREA expansion project. It consisted of finishing the underground firewater system, storm water system and excavation/backfill/support for the electrical ductbanks and cooling water piping installation. There were many challenges including an expedited schedule leading into the winter and required continual coordination amongst contractors to allow for multiple tasks to take place within the same work areas. The underground utilities required excavations with depths up to 16 ft and the need for multiple shoring options. The complex existing underground utility layout also presented challenges and required many hours of hydrovac excavation and potholing to assure safe excavation and installation of new utilities.

PROJECT HIGHLIGHTS

  • 25,000 CY Excavation for Electrical Ductbanks
  • and Cooling Water Piping
  • 200 LF of Slide Shoring Installed
  • 1,825 LF of HDPE Firewater Piping Installed
  • 33 EA Fire Hydrants Installed
  • 34 EA Storm Water Catch Basins Installed
  • 740 LF of RCP Storm Water Piping Installed
  • 780 LF of RCC Storm Water Trench Installed
  • Electrical and Mechanical Piping Support

Other Projects